COMPLETE REPAIR REQUEST — EXHIBIT-CARDS-01 Prepare one complete repaired static chart from the entire packet below. This is original fictional teaching material, not operational exhibition data. The wrong figure is deliberately authored. No model output is being diagnosed. The complete original CSV, definitions, wrong plotted CSV and entire wrong SVG are included verbatim below. The wrong SVG is the complete error artifact; wrong-chart.png is its optional raster preview, not a missing input. Use the original CSV and definitions as the authority, not the wrong plotted CSV or its labels. Preserve all four batches, catalogue order, card units and the fictional snapshot. Retain the raw CSV unchanged. Calculate Remaining as Total minus Checked. Total includes Checked; do not stack Total beside Checked or divide Checked by Checked plus Total. Keep explicit zero distinct from missing input; do not add measurements, people, approvals or outcomes. Return the full derived table, a complete repaired SVG and its actual rendered PNG, with the full caption and text/data alternative. Use a common zero-based count axis from 0 to 32 with ticks at 0,8,16,24,32. Both positive and zero state counts must remain in direct text labels. Do not merely replace percentages, return a chart-type recommendation, or explain how a future repair could work. Check every source row against the derived values, rendered series and actual SVG positions/lengths. Use the same input and scale for all four batches. Make one real temporary change to E02 Checked from 8 to 10 while leaving Total at20, regenerate a separate candidate and inspect its geometry and labels. Preserve that changed input/output evidence, restore the original input and regenerate the baseline, then report whether the original bytes/outputs were restored. Use ordinary trustworthy local plotting/rendering tools. The supplied SVG is static vector source, not a native Excel data-series object. Do not claim model accuracy, time savings, current native-office compatibility, accessibility certification or SEO results. Do not contact anyone or use external services. If a needed input or definition is missing, identify the gap instead of making up data. In this packet, all four rows and the mutual-exclusion rule are supplied. --- BEGIN COMPLETE source-data.csv --- snapshot_utc,batch_id,batch_label,total_cards,checked_cards 2030-06-12T14:00:00Z,E01,Harbour,12,9 2030-06-12T14:00:00Z,E02,Garden,20,8 2030-06-12T14:00:00Z,E03,Machines,16,0 2030-06-12T14:00:00Z,E04,Night,8,8 --- END COMPLETE source-data.csv --- --- BEGIN COMPLETE source-notes.en.md --- # Exhibition card checks — complete fictional source definitions Original teaching case EXHIBIT-CARDS-01. The four batches and every count were authored for this case. There is no real exhibition, customer, worker performance, financial value or recorded model run. The 2030 date is a fictional snapshot label, not a publication date or actual data-collection event. The reader needs to compare the number of checked and remaining exhibition information cards in each batch at **2030-06-12 14:00 UTC**. - One row is one complete batch at that single snapshot. The unit is cards. - E01–E04 are disjoint batches, in catalogue order. A card belongs to exactly one batch; do not merge, omit, reorder or deduplicate rows. - `total_cards` includes checked cards. `checked_cards` counts cards whose text has been checked. Checking is not approval for publication or evidence of visitor understanding. - Every card is either checked or remaining at this snapshot. These states are mutually exclusive and exhaustive. `remaining_cards = total_cards - checked_cards`. - The checked share is `checked_cards / total_cards`, not `checked_cards / (checked_cards + total_cards)`. All four supplied totals are positive. A future zero total would have an undefined share, not an automatic 0%. - Counts are nonnegative integers and checked cannot exceed total. The explicit zero for Machines is known zero checked, not missing data; Night is fully checked. - Summing counts across these disjoint batches is valid. Any overall share uses the summed numerator and denominator; do not average batch percentages. - The chart compares counts, not percentages or people. Use one horizontal count axis from 0 to 32, with ticks at 0, 8, 16, 24 and 32, for both wrong and repaired teaching figures. Two stacked series in the repaired chart are Checked and Remaining. - Keep the same catalogue order E01 through E04 from top to bottom. Preserve the raw CSV; derived values belong in a separate file. - Show every batch, unit, snapshot and exact state counts. Distinguish states with text and light/dark fills, not colour alone. Give the complete data table and a text alternative alongside the chart. The chart is a static SVG with a PNG preview. It is not a native Excel chart and establishes no office-application compatibility or accessibility certification. --- END COMPLETE source-notes.en.md --- --- BEGIN COMPLETE wrong-chart-data.csv --- snapshot_utc,batch_id,batch_label,total_cards,checked_cards,incorrect_remaining_series,plotted_total,wrong_checked_share_pct 2030-06-12T14:00:00Z,E01,Harbour,12,9,12,21,42.9 2030-06-12T14:00:00Z,E02,Garden,20,8,20,28,28.6 2030-06-12T14:00:00Z,E03,Machines,16,0,16,16,0.0 2030-06-12T14:00:00Z,E04,Night,8,8,8,16,50.0 --- END COMPLETE wrong-chart-data.csv --- --- BEGIN COMPLETE wrong-chart.svg --- Deliberately wrong chart: Exhibition cards checked and remaining; fictional snapshot 2030-06-12T14:00:00Z; unit: cards Original fictional EXHIBIT-CARDS-01 snapshot at 2030-06-12T14:00:00Z. Unit: cards. Four disjoint catalogue batches on a shared zero-based 0-32 card axis. Deliberate teaching error: the light segment uses the whole Total as Remaining, so checked cards are counted twice. These are wrong plotted values, not corrected counts. E01 Harbour: 9 checked, 12 incorrectly labelled remaining, 21 plotted cards, 42.9% checked; E02 Garden: 8 checked, 20 incorrectly labelled remaining, 28 plotted cards, 28.6% checked; E03 Machines: 0 checked, 16 incorrectly labelled remaining, 16 plotted cards, 0.0% checked; E04 Night: 8 checked, 8 incorrectly labelled remaining, 16 plotted cards, 50.0% checked. Dark is Checked; light is Remaining. Static SVG; the full source table and text alternative accompany the figure. Deliberately wrong: checked counted twice Original fictional snapshot | 12 June 2030, 14:00 UTC | Unit: cards Wrong series: Checked + Total, presented as Checked + Remaining. Exact counts and checked share E04 Night E03 Machines E02 Garden E01 Harbour 0 8 16 24 32 9 checked | 12 remaining 21 plotted total | 42.9% checked 8 checked | 20 remaining 28 plotted total | 28.6% checked 0 checked | 16 remaining 16 plotted total | 0.0% checked 8 checked | 8 remaining 16 plotted total | 50.0% checked Number of cards Checked (dark) Remaining (light) Teaching counterexample: values do not follow the supplied definition. --- END COMPLETE wrong-chart.svg ---